The top half of the molds have been done and the shims pulled out. The sculptures are flipped over, damage from the shims is touched up, and the bottoms are detailed.
Next step, doing the bottom half of the molds. Then, the molds are pulled apart, the sculpture removed and the molds cleaned and touched up. Then I get to run a test pull ...
(crossposted from FA - original c. 2010)